Typical situations
- A PAtools bench delivered by an integrator must be adapted to new tests.
- New equipment or new channels must be added to an existing bench.
- A test sequence does not behave as expected and the team cannot find why.
- The person who knew PAtools has left the team.
- A bench project needs a realistic quote for the PAtools part.
My PAtools work
Configuration and parameter setup
PAtools test bench configuration, declaration of equipment and measurement channels, parameter setup for your tests.
Test sequences and libraries
Writing and optimising test sequences, building reusable libraries so your teams can launch new tests without starting from scratch.
Extending existing benches
New channels, new equipment, new test types. The scope is agreed before starting: PAtools only, or coordinated with the safety PLC and the rest of the bench.
Troubleshooting and corrective support
Analysis of abnormal behaviour, fixes and safeguards on production benches, keeping bench downtime to a minimum.
Making your teams self-sufficient
During each assignment I work alongside operators, technicians and engineers so they can evolve their tests themselves.
On site or remote, in France and across Europe
I work on site Monday to Friday, in France and abroad, in English or French. For larger topics, I can team up with a partner from my network.
Real example: automating a power electronics test bench with PAtools in Spain.